HIO Firmware 7.023 supports the new 5V CPU
Previous versions 7.00x were for the 3.3V CPU which has been superceded
Changes
- Added 3 more Master scenes (ie. Total 4 Master scenes now).
- Added new sequence scene function. With each pressed, a different scene is activated, starting from scene 1 to 4 and back to scene 1.
- Added new 1-button Blinds function with 2 outputs. The first output is for Up direction and the second output is for down direction.
- Fixed temperature reading giving 255 (FFh) for some boards, when TS input is shorted to ground. Correct reading is 100 (64h).
|
Posted: Sunday Feb 3rd, 2019 06:24 am |
|
2nd Post |
slychiu
Administrator
Joined: | Saturday Apr 29th, 2006 |
Location: | Singapore |
Posts: | 5596 |
Status: |
Offline
|
back to top
|
HIO Firmware 7.024 Changes- Ignore Master Switch Setting and all operations are permanently set to “Master On scene†mode.
- Support for Normally Open (NO) settings of Room and Toilet PIR operations.
- Improved shutdown operation. At the end of shutdown period, a final status check is done Room and Toilet PIR. If either is ON, room shutdown is aborted. This caters for long “ON†pulse PIR.
- Improved handling for primary and secondary relay shutdown, in cases where no primary or/and secondary relay setup.
- Improved room occupancy sensing criteria to activate. Previously, if no Room PIR in channel, this function is not enabled. Now it includes Toilet PIR as well.
- Changed the behaviour after keycard is removed, lights are not switched off if PIR status is on.
|
|