Comfort  Automation/ Security System Forums Home

 Moderated by: ident  
AuthorPost
slychiu
Administrator


Joined: Saturday Apr 29th, 2006
Location: Singapore
Posts: 5493
Status: 
Offline

  back to top





OP04 is an Output Submodule with 4 Relays which plugs in to CM9001 in place of OP01 (with 8 open-collector Outputs).
This connects 4 relays direct to Outputs 1 to 4 of CM9001. Outputs 5 to 8 are not available when OP04 is plugged in





Swiss-Toni
UCM Pi Users


Joined: Thursday Sep 15th, 2011
Location: Greater London, United Kingdom
Posts: 349
Status: 
Offline

  back to top

With the OPO1 if the board goes you would just replace the board, if this goes you have to replace the board or is that a resetable fuse set into it, also what what is the voltage max capacity.

slychiu
Administrator


Joined: Saturday Apr 29th, 2006
Location: Singapore
Posts: 5493
Status: 
Offline

  back to top

If this fails you also replace the submodule just line OP03 and OP01

It is less likely to fail than OP03 or OP01 because the relays have 5000V isolation/breakdown volatge.
In OP01 and OP03 the outputs are open collector transistor outputs and are more easily damaged


UltraBB 1.172 Copyright © 2007-2014 Data 1 Systems