09-10-2015, 04:26 PM
Hi,
Having only imported scenarios before, I wonder if someone can assist in a small project, where the hardware is not the issue, but I\'m not sure about the programming side.
I have in the garage 2 door contacts and a PIR. I have a couple of spare cores coming from my comfort panel, one of which is connected to Output 1 on the comfort PCB; and to a 12V 240V relay across the light switch will hopefully be operating the lights.
I wish to set comfort up, that 30 mins before sunset & 30 mins after sunrise - if one of the doors 2 of is opened, the lights will come on. At the end of 15mins, if no PIR movement is detected and the doors are closed, then lights should go off.
Assistance is much appreciated.
Having only imported scenarios before, I wonder if someone can assist in a small project, where the hardware is not the issue, but I\'m not sure about the programming side.
I have in the garage 2 door contacts and a PIR. I have a couple of spare cores coming from my comfort panel, one of which is connected to Output 1 on the comfort PCB; and to a 12V 240V relay across the light switch will hopefully be operating the lights.
I wish to set comfort up, that 30 mins before sunset & 30 mins after sunrise - if one of the doors 2 of is opened, the lights will come on. At the end of 15mins, if no PIR movement is detected and the doors are closed, then lights should go off.
Assistance is much appreciated.